Ballooned drawings
| Date | Part | Drawing / Rev | Chars | Read by |
|---|
Drop a drawing here, or
Vector PDF (CAD export) · scanned PDF · PNG / JPG / TIFF
Company details
Your logo and name, used in place of the customer's on the ballooned print. The drawing as supplied is never changed.
PNG or JPG, up to 4 MB. A wide logo suits a title block best.
Balloon colours
Used on every new render. An existing print is not repainted until it is re-ballooned.
Your account
Change the password you sign in with.
People
Everyone who can sign in to this installation.
| Name | Username | Role | Last seen |
|---|
Sign in as an administrator to change rates. Everyone can see them to build a quotation.
Costing sheet defaults
Applied to every new costing sheet under Costing - each one can still override them.
Materials
Category + Grade identify a material once, reused on every costing line picked from a dropdown. Rate per kg prices the stock a part is machined from; scrap price and recovery % price back the metal turned off as swarf.
| Category | Grade | Density | Rate (₹/kg) | Landed rate | Scrap (₹/kg) | Recovery % |
|---|
Finishes
Each finish type prices at its own rate per kg - picked per costing line the same way Material already is.
| Name | Rate (₹/kg) |
|---|
Material rate (MMR + CIAN)
MMR (Metal Market Rate) is pulled from MCX where it has a contract; CIAN (freight / duty / processing premium) is always entered by hand. The landed rate a costing sheet uses is the trailing 3-month average of both.
| Month | MMR | CIAN | Source |
|---|
Processes
Machining and inspection are priced by the hour; a secondary process such as plating is priced by kg or by part; a machine's own cycle-time rate is priced by the minute.
| Name | Kind | Rate | Basis |
|---|
| Sheet | Customer | Date |
|---|
Quotation
What the customer sees when this sheet's Quotation is downloaded - item, quantity (each line's EAU) and unit price only, no cost breakdown.
| Part name | Cat | Material | Finish | Input wt | Net wt | Cycle (min) | Material ₹ | Conv. ₹ | Total ₹ | Final ₹ |
|---|
Add a line
Drag any balloon to reposition it, or right-click it to edit or delete. Click Add balloon, then click the drawing where the callout sits - or right-click empty space to add one there directly.
| # | Type | Specification | Nominal | +Tol | −Tol | Limits | CC |
|---|